Copies of copies
Version 7, version 7-final, version 7-final-JH. Three people, three totals, one project.
The cost book for architecture studios
Every line of every project, priced, tagged and checked in one place, from the first allowance to the last payment. Your team works from one figure. You always know how firm it is.
of the construction cost rests on an offer, an agreement or an actual figure. The rest is still a rough figure, and you can see exactly where.
The problem
Every studio prices projects the same way: a workbook per project, copied from the last one, edited by whoever had it open last. It works until the client asks what changed, and nobody can say.
Version 7, version 7-final, version 7-final-JH. Three people, three totals, one project.
The pool excavation that was in nobody's sheet. You find it on site, when it is already the client's problem.
Three PDFs, three layouts, one contractor quietly left out the formwork. The cheapest offer was not the cheapest.
An invoice typed once, by one person, and paid. Nobody checked the VAT added up.
The drawings have one source of truth. The cost should too.
How it works
From the first drawing to the last payment, every step writes to the same line. Nothing is retyped, so nothing drifts.
Every sheet and revision is registered against the lines it prices.
Revised after an offer went out? Flagged.Built from your master template. Quantities typed as workings, tagged by trade and feature.
Counted, not applicable, or openQuantities frozen. Each contractor prices your lines, in your format, through a personal link.
Same lines, same order, every offerCompare like for like, award, and the rate is written onto the line, with who and when.
Status becomes From offerPriced before anyone agrees. The client approves on their own link; it lands on their house only.
Fees shown, never charged twiceEntered against the contractor and checked: net plus VAT must equal gross.
Pending until a second person confirmsPaid on account, matched to invoices, a running balance per contractor and per client.
Left to pay, always currentOne master template
Your studio's own bill of quantities, 29 articles from general terms to fees, becomes the stencil for every new project. Nothing to remember. Nothing to forget.
The 29 articles · each with sub-articles and itemsHighlighted: where #boundary-wall appears
| Code | Item | Unit | Total qty | Rate | State | Amount |
|---|---|---|---|---|---|---|
| 2.1.2 | General building excavation – soil#earthworks | m³ | 1,240.00 | €14.50 | Counted Agreed | €17,980.00 |
| 3.2.1 | Standard foundations — footings, rafts, walls#concrete-technician | m³ | 186.40 | €198.00 | Counted From offer | €36,907.20 |
| 3.3.1 | Slabs, beams and columns#concrete-technician | m³ | 214.00 | €252.00 | Counted From offer | €53,928.00 |
| 3.6.1 | Boundary walls#boundary-wall#concrete-technician | m³ | 46.20 | €236.00 | Counted From offer | €10,903.20 |
| 4.1.3 | Stone boundary wall#boundary-wall#stonemason | m² | 132.00 | €165.00 | Counted Estimate | €21,780.00 |
| 5.2.1 | Roof waterproofing (horizontal & upstand)#roof | m² | 410.00 | €32.00 | Counted Needs confirmation | €13,120.00 |
| 5.3.1 | External wall insulation (ETICS)#facade | m² | 690.00 | €48.00 | Counted Allowance | €33,120.00 |
| 2.1.5 | Swimming-pool excavation#pool | m³ | no quantity | €15.00 | Open | — |
| 3.2.2 | MicropilesNot applicable · no piles in the soil report · M. Castell | m | — | — | Not applicable | — |
Illustrative demo: this toggle visually hides example prices only; it does not enforce access control. In the production product, restricted financial fields must be omitted server-side. Quantities, drawings and questions stay.
Nothing left out · the detail meter
Every amount carries its status: allowance, estimate, needs confirmation, from offer, agreed, actual. The detail meter turns them into one honest sentence about your budget, so "how general is this still?" ends the argument instead of starting one.
Construction cost, each project rule, then VAT.
How much of the money is still a rough figure.
71% of the construction cost rests on an offer, an agreement or an actual figure.
€133,761.60 is still a general allowance waiting to be detailed.
Every template item is counted, not applicable, or still open.
21 items nobody has decided on. Give each a quantity or mark it not applicable.
1 must fix · 3 to look at. They inform; they never block.
Stuck or critical stages.
| 19. Roofs | Pricing | Critical |
| 15. Windows | Drawings | Stuck |
Share of construction cost by price status, at eight moments of one project. Hatched bands are still rough. The white line is the firm share.
| Moment | Allowance | Estimate | Needs confirmation | From offer | Agreed | Actual | Firm |
|---|---|---|---|---|---|---|---|
| Concept | 62% | 34% | 4% | 0% | 0% | 0% | 0% |
| Permit | 41% | 47% | 8% | 4% | 0% | 0% | 4% |
| Tender issued | 30% | 48% | 12% | 8% | 2% | 0% | 10% |
| Offers in | 18% | 30% | 10% | 34% | 8% | 0% | 42% |
| Awards | 12% | 18% | 7% | 26% | 37% | 0% | 63% |
| Site start | 9% | 14% | 6% | 23% | 41% | 7% | 71% |
| Frame | 6% | 9% | 4% | 15% | 46% | 20% | 81% |
| Fit-out | 2% | 4% | 2% | 8% | 42% | 42% | 92% |
Offer requests · compare · award
Contractors price your lines, in your order, through their own link. Blanks and exclusions are filled with your estimate and marked, so the lowest total is the lowest real total. Award, and the rate is written onto the line with its source.
6 lines · 3 offers · lowest like for like: Northline Concrete
| Item | Quantity | Studio estimate | Northline Concrete Lowest like for like | Keel & Co. Builders | Stonebridge Works |
|---|---|---|---|---|---|
| 3.1.1 Blinding concrete | 38.50 m³ | €3,657.50 | €3,465.00 −5.3% | €3,811.50 +4.2% | €3,388.00 −7.4% |
| 3.2.1 Standard foundations | 186.40 m³ | €39,144.00 | €36,907.20 −5.7% | €41,194.40 +5.2% | €38,212.00 −2.4% |
| 3.3.1 Slabs, beams and columns | 214.00 m³ | €56,710.00 | €53,928.00 −4.9% | €59,706.00 +5.3% | €56,710.00 Excluded · filled with estimate |
| 3.3.5 B500C reinforcement | 31,600 kg | €43,608.00 | €41,396.00 −5.1% | €42,976.00 −1.4% | €42,028.00 −3.6% |
| 3.3.6 Formwork | 1,840 m² | €44,160.00 | €43,240.00 −2.1% | €47,840.00 +8.3% | €40,480.00 −8.3% |
| 3.6.1 Boundary walls | 46.20 m³ | €11,088.00 | €10,903.20 −1.7% | €12,104.40 +9.2% | €10,579.80 −4.6% |
Totals hide the story. Line by line, Stonebridge is sharpest on formwork but left out the frame; Northline is steadily under; Keel is dearer almost everywhere.
South House · raised by the client on their link · priced by M. Castell
| Line | Quantity | Rate | Amount |
|---|---|---|---|
| 16.1.2 Metal pergolas & louvres Change to an existing line, at its own price | +18.00 m² | €410.00 | €7,380.00 |
| 16.1.1 External shading & louvres New item, its own line | 18.00 m² | €95.00 | €1,710.00 |
| Priced lines | €9,090.00 | ||
| Contingency 5% | €454.50 | ||
| Overheads 8% | €727.20 | ||
| Total with fees (net of VAT) | €10,271.70 | ||
Change orders
Clients raise a change on their own link. You price it. They see its value, and the fees it will carry, before they say yes.
Invoices · payments · income
Supplier invoices, payments on account and client income are tracked next to the budget, per company. An invoice counts nowhere until someone other than the person who entered it confirms it.
Entered by J. Hale. Anyone but J. Hale may confirm.
| Contractor | No. | Date | Net | VAT | Gross | Status |
|---|---|---|---|---|---|---|
| Northline Concrete | 2026-0412 | 14 Oct | €24,000.00 | €5,760.00 | €29,760.00 | Confirmed |
| Stonebridge Works | SB/77 | 21 Oct | €9,400.00 | €2,256.00 | €11,656.00 | Confirmed |
| Northline Concrete | 2026-0451 | 2 Nov | €18,500.00 | €4,440.00 | €22,940.00 | Pending |
| Clearwater MEP | CW-118 | 6 Nov | €6,200.00 | €1,488.00 | €7,688.00 | Pending |
Refused on entry unless net + VAT = gross. The same contractor, number and date twice is refused.
Confirmed invoices only
2 pending invoices, €30,628.00, count nowhere until confirmed. Payments on account are matched to invoices as they arrive.
Cost centre
Because every project shares the template, the same item can be compared across all of them. The widest spreads come first, so a wrong rate shows up as fast as a real difference.
A green roof at €920 per m² on one project and €68 to €81 on three others is almost certainly a total typed into a rate. The cost centre puts it at the top of the page.
The same template item priced across live projects, by article.
As likely a wrong rate as a real difference.
| Code | Item | By project | Low | High | Spread |
|---|---|---|---|---|---|
| 19.2 | Green roofs m² | Pine Terrace: €920 Harbour Lofts: €81 Olive Court: €74 Halcyon Ridge: €68 | €68.00 | €920.00 | ×13.5 |
| 8.4.1 | Wall tiling m² | Harbour Lofts: €140 Olive Court: €52 Halcyon Ridge: €38 | €38.00 | €140.00 | ×3.7 |
| 5.1.1 | Foundation waterproofing m² | Olive Court: €24 Pine Terrace: €21 Halcyon Ridge: €18 | €18.00 | €24.00 | ×1.3 |
Built for the whole studio
Juniors, engineers, directors, contractors and clients all work in the same record. Each sees precisely their part of it.
Rates, amounts, prices and contractors' offers are removed before a junior's screen is drawn, not just hidden. They still ask questions on any line.
Quantities, rates, awards, confirmations: each change keeps who, when, the old value and the new one. Issued offers and baselines are frozen and cannot be edited.
Seventeen checks watch for double counting, import errors and loose ends, and say exactly which lines.
Each person picks their language. Article and item names switch with it; units and figures stay as written.
Price your own offer line by line: original cost, markup, studio offer. Issue numbered versions; when the client signs, convert it into the project.
Four stages per article, each with an owner and a state. Export the plan to the board your team already uses for timelines.
Why every studio needs one
Clients forgive a late drawing. They do not forgive a number that moved without an explanation. A cost book is how a studio keeps its word.
One record per project, shared by the whole studio. The figure in the client meeting is the figure on site.
No copies, no versions, no final-final. Every total is the sum of its lines, at every level, every time.
Send the same lines to every contractor, receive them back in your format, compare like for like in minutes, award in one click.
Open lines, rough figures and loose ends are visible early, while they are still cheap to fix.
Every change has a name, every invoice a second pair of eyes, every client a clear view of what they approved.
One level every cost is measured from. For every project your studio will build.